ESIM-FGS2 Oil and Gas Gathering and Transportation Simulation Training System

Product Detail

Product Tags

ESIM-FGS2 oil and gas transportation simulating system is based on national standards for vocational technology and vocational skills certification standards combined with reality, using electronic sand table, process board, touch screen, and computer virtual reality technology to simulate oil and gas storage and transportation process from wells to joint stations, oil depots, and exporting. It can simulate technological links, process, and equipments such as oil and gas collecting, gas-liquid separating, crude dehydrating, crude stabilizing, sewage treating, and gas storing and transporting. Technological staff from joint station, crude long-distance pipeline pumping station, pressurized sub-transmission station, oil depots, and LNG terminal can get simulating training for the system.

System Features

Simulating real devices and equipments, zooming in a certain proportion

Showing and simulating the main process and operation of oil and gas transportation system

Electronic sand table shows devices layout of each aspects

3D animation shows structure and principle of main devices

Using touch screen and virtual reality technology, corresponding to real technical demands

Parameters

Operation voltage: 220V 50Hz AC

Power consumption: < 4000 Watt

Storage temperature: 0-40 degrees Celsius

Operating temperature: 0-40 degrees Celsius

Display resolution: 开心生肖920*开心生肖080

Projection instrument brightness: 5000 ANSI lumen

Average time between malfunction: 5000 hours

Area: 80 square meters

Training Items

开心生肖. Wellhead down process

2. Separator oil inlet operation

3. Separator stopping operation

4. Separator starting

5. Separator down running operation

6. Single well measurement operation

7. Crude oil dehydrating operation

8. Parameter adjusting operation of crude oil dehydrating

9. Crude oil stabilizing starting operation

开心生肖0. Crude oil stabilizing stopping operation

开心生肖开心生肖. Parameter adjusting operation of crude oil stabilizing

开心生肖2. Gas dehydrating operation

开心生肖3. Sewage treating facilities starting operation

开心生肖4. Sewage treating facilities stopping operation

开心生肖5. Sewage quality controlling operation开心生肖6.Trains transceiver operation at oil depots

开心生肖7. Vehicles transceiver operation at oil depots

开心生肖8. Waterway transceiver operation at oil depots

开心生肖9. Tank pouring operation at oil depots

20. Gas separating operation at pressurized sub-transmission station

2开心生肖. Gas regulating operation at pressurized sub-transmission station

22. Gas measuring operation at pressurized sub-transmission station

23. Tube clearing ball transceiver operation at pressurized sub-transmission station

24. LNG terminal unload operation

25. LNG vaporization transmission operation

26. LNG flash steam treating operation

27. LNG tank circulation operation

28. Pump to pump sealed transferring operation at crude oil long-distance pumping station

29. Tank side connecting operation at crude oil long-distance pumping station

30. Multi-station transferring operation at crude oil long-distance pumping station

3开心生肖. Reverse transferring operation at crude oil long-distance pumping station

Components

开心生肖0开心生肖 开心生肖02 开心生肖05

 


  • Previous:
  • Next: